A.The present proposal is as follows:
Activities |
Existing Capacity(In TPA) Operational |
Proposed Capacity |
Steel Billets (SMS) |
Steel Billets (SMS) |
Modernization and enhancement in production capacity of Steel Melting Shop (Billets) from existing 4,00,000 TPA to 7,00,000 TPA by change in configuration of induction furnaces and installation of additional furnaces |
Power Plant
|
73 MW |
Modernization of existing power plant by change in
configuration of existing 3 TG Sets [TG-1 : 9 MW, TG2
:
9 MW, TG-4 : 30 MW (+1 standby)] with one new
energy efficient TG set of 48 MW capacity (+standby)
and all existing TG shall also be retained for abnormal
situations. |
Iron Ore
Pelletization Plant
along with coal
gasification plant |
21,00,000 (Existing 2
Units: First unit of
6,00,000 TPA &
second unit of
15,00,000 TPA) along
with 60,000 Nm3/hr
coal gasification plan |
Enhancement in production capacity of Iron Ore
Pellet Plant from existing 21,00,000 TPA (2 units)
with Coal Gasification System to 24,00,000 TPA
alongwith Coal Gasification System from existing
capacity of 60000 NM3/hr to 92000 NM3/hr
(within which 22,00,000 TPA will be pellet
manufacturing & 2,00,000 TPA manufacture of
Magnetite Powder / Heavy Media or 24,00,000
TPA Pellet). |
Arc Furnace to
Induction Furnace
for Casting
including
engineering &
fabrication |
- |
5,000 TPA(to be revised to Induction Furnace for
Casting including Engineering & Fabrication.) |
Slag Crushing Plant |
-
|
2,00,000 TPA |
Mineral Grinding
Plant |
Nand Kumar Kumbhakar |
2.96 |
HB Wire |
1,00,000 TPA |
2,00,000 TPA |
Iron Ore
Beneficiation Plant |
10,00,000 TPA |
32,84,000 TPA |
1.
Summary EIA Report in English Language
2.
Summary EIA Report in Hindi Language
|
The copies of Summary
EIA Report (English & Hindi) and Draft EIA Report
are available for inspection for public at the offices of
following authorities during normal office hours till the date
of public hearing |
S. No. |
Authority
|
Address
|
01 |
Director |
Ministry of Environment, Forest & Climate Change Indira Paryavaran Bhavan Jor Bagh Road New Delhi - 110 003 |
02 |
Chief Conservator of Forest |
Regional Office(West-Central Zone), Ministry of Environment and Forest, Government of India, Ground Floor East Wing, New Secretariat Building , Civil Line Nagpur Maharastra. |
03 |
Collector |
Office
of the Collector, District-Raipur (C.G.). |
04 |
General Manager |
District Industries and Trade Center, District-Raipur (C.G.). |
05 |
Chief Executive Officer |
Office
of the Zila Panchayat Raipur, District-Raipur (C.G.). |
06 |
Janpad Panchayat Adhyaksh |
Office of the Janpad Panchayat Dharsiwa, District-Raipur (C.G.). |
07 |
Sarpanch |
Office of the Gram Panchayat Siltara, Tanda, District-Raipur (C.G.). |
07 |
Member Secretary |
Chhattisgarh Environment Conservation Board, Paryavas Bhavan, North Block Sector-19, Naya Raipur(C.G.) 490099 |
08 |
Regional Officer |
Regional Office, Chhattisgarh Environment Conservation
Board, Raipur(C.G.). |
|
The
interested persons may send their comments to the Regional
Office, Chhattisgarh
Environment Conservation Board at the Regional Office,
Chhattisgarh Environment Conservation Board, Raipur (C.G.)
|
Date of Public Hearing |
17/02/2020, Day –Monday |
Time of Public Hearing |
11:00 AM |
Venue of Public Hearing |
Project Area Tanda Ground Phase-I, Industrial Area Siltara, District-Raipur(C.G.). |
Status |
|
|
| | |