As per provision of the notification, Chhattisgarh Environmental Conservation Board is placing the Summary Environment Impact Assessment reports in English and Hindi language of the following projects/activities proposed by Godawari Power & Ispat Ltd(Expansion / Modernization of existing facilities of Godawari Power and Ispat Ltd. & subsequent Merger of ECs). 428/2, Phase-I, Industrial Area, Siltara, Raipur – 493111, Chhattisgarh.To refer the Summary Environment Impact Assessment reports  please click the respective project/activity shown below :-

A.The present proposal is as follows:

Activities
Existing Capacity(In TPA) Operational
Proposed Capacity
Steel Billets (SMS)
Steel Billets (SMS)
Modernization and enhancement in production capacity of Steel Melting Shop (Billets) from existing 4,00,000 TPA to 7,00,000 TPA by change in configuration of induction furnaces and installation of additional furnaces
Power Plant
73 MW
Modernization of existing power plant by change in configuration of existing 3 TG Sets [TG-1 : 9 MW, TG2 : 9 MW, TG-4 : 30 MW (+1 standby)] with one new energy efficient TG set of 48 MW capacity (+standby) and all existing TG shall also be retained for abnormal situations.
Iron Ore
Pelletization Plant
along with coal
gasification plant
21,00,000 (Existing 2 Units: First unit of 6,00,000 TPA & second unit of 15,00,000 TPA) along with 60,000 Nm3/hr coal gasification plan
Enhancement in production capacity of Iron Ore
Pellet Plant from existing 21,00,000 TPA (2 units)
with Coal Gasification System to 24,00,000 TPA
alongwith Coal Gasification System from existing
capacity of 60000 NM3/hr to 92000 NM3/hr
(within which 22,00,000 TPA will be pellet
manufacturing & 2,00,000 TPA manufacture of
Magnetite Powder / Heavy Media or 24,00,000
TPA Pellet).
Arc Furnace to
Induction Furnace
for Casting
including
engineering &
fabrication
-
5,000 TPA(to be revised to Induction Furnace for Casting including Engineering & Fabrication.)
Slag Crushing Plant
-
2,00,000 TPA
Mineral Grinding
Plant
Nand Kumar Kumbhakar
2.96
HB Wire
1,00,000 TPA
2,00,000 TPA
Iron Ore
Beneficiation Plant
10,00,000 TPA
32,84,000 TPA

        1.  Summary EIA Report in English Language

 

          2.  Summary EIA Report in Hindi Language

 

The copies of Summary EIA Report (English & Hindi) and Draft  EIA Report  are available for inspection for public at the offices of following authorities during normal office hours till the date of public hearing

S. No.

Authority 

Address

01 Director

Ministry of Environment, Forest & Climate Change Indira Paryavaran Bhavan Jor Bagh Road New Delhi - 110 003

02 Chief Conservator of Forest Regional Office(West-Central Zone), Ministry of Environment and Forest, Government of India, Ground Floor East Wing, New Secretariat Building , Civil Line Nagpur Maharastra.
03

Collector

Office of the Collector, District-Raipur (C.G.).
04 General Manager District Industries and Trade Center, District-Raipur (C.G.).
05 Chief Executive Officer Office of the Zila Panchayat Raipur, District-Raipur (C.G.).
06 Janpad Panchayat Adhyaksh Office of the Janpad Panchayat Dharsiwa, District-Raipur (C.G.).
07 Sarpanch Office of the Gram Panchayat Siltara, Tanda, District-Raipur (C.G.).
07 Member Secretary Chhattisgarh Environment Conservation Board, Paryavas Bhavan, North Block Sector-19, Naya Raipur(C.G.) 490099
08 Regional Officer Regional Office, Chhattisgarh Environment Conservation Board, Raipur(C.G.).

 

 The interested persons may send their comments to the Regional Office, Chhattisgarh Environment Conservation Board at the Regional Office, Chhattisgarh Environment Conservation Board, Raipur (C.G.)

 

Date of Public Hearing 17/02/2020, Day –Monday
Time of Public Hearing 11:00 AM
Venue of Public Hearing Project Area Tanda Ground Phase-I, Industrial Area Siltara, District-Raipur(C.G.).
Status  

 


Copyright  CECB, Raipur, Chhattisgarh

 

Disclaimer

All efforts have been made to make the information as accurate as possible, Chhattisgarh Environment Conservation Board, will not be responsible for any loss to any person caused by inaccuracy in the information available on this Website. Any discrepancy found may be brought to the notice of Chhattisgarh Environment Conservation Board.